Bestkaam Logo
Back to Jobs
Adani Green Energy Ltd.

Instrumentation Manager

Actively Reviewing

Adani Green Energy Ltd.

Andhra Pradesh Full-Time 4–8 yrs exp Posted 1 month ago  · Apply by Jul 18, 2026
Responsibilities

  • Ensure reliable, safe and efficient operation of all generating units, auxiliaries, and balance of plant systems.
  • Ensures full compliance with Statutory HSS, environmental, cybersecurity and technical requirements from central and state governmental bodies (i.e. CEA, CERC, DSA, SCEI, cybersecurity etc. compliances).
  • Responsible for PTW, LOTO, isolations, HIRA, TBT, JSA for assigned areas.
  • Operation & Maintenance of OT and IT systems for Plant SCADA and control system.
  • High level understanding of SCADA and Control System site acceptance testing and its associated documentation.
  • Manage external interfaces to the plant i.e. RCI, EMI, AGC, interface to SLDC / RLDC over PLCC and Forte etc. Co-ordination for implementation of Remote-Control Interface (RCI) at Plant with central team.
  • Handle all operational emergencies/trouble shooting pertaining to C&I area, for sustainable production. Monitoring critical parameters and render technical help to resolve the anomalies.
  • Active co-ordination with Control Room Operators for smooth functioning of Control room equipment. Analyze the performance and bring operational improvement.
  • Manage inventory of instruments, Plant OT, IT system and maintain all licenses.
  • Create and implement maintenance procedures for Plant SCADA/control system equipment.
  • Guide and train engineers and technicians on maintenance and troubleshooting of plant SCADA/ control system equipment.
  • Ensure timely calibration of field instruments installed at Plant.
  • Lead equipment failure investigations and analysis for C&I part, establish RCA framework and implement performance monitoring, corrective actions and continuous improvement methodology.
  • Preparation of service contract and contract management for C&I maintenance for works outsourced to external service providers.
  • Preparation and implementation of C&I maintenance reports and checklists, including daily, monthly, quarterly, and annual reports and checklists. Maintain accurate records of maintenance activities, testing results, and plant drawings etc.
  • Prepare and manage plant C&I maintenance budget, work to optimize the costs and maximize production.
  • Support electrical maintenance section head in plant improvement projects, modernization initiatives, digital transformation, and automation upgrades.
  • To devise appropriate PM schedules for all critical equipment as per OEM recommendations/maintenance plan and ensure proper implementation.
  • IMS implementation, documentation preparation and updating, pertaining to your area.
  • Ensures adherence to Cybersecurity requirements and compliance for Plant process control system. Support IT team in documentation and implementation of ISMS 27001.
  • Perform any other duties as may be assigned by the Electrical Section Head, from time to time.

Qualifications

  • Bachelor’s degree in electrical/electrical & electrical/electronic and instrumentation engineering.
  • Proven expertise maintenance within hydro power generation sector, with a minimum of 10 years of experience.
  • Strong knowledge of statutory and regulatory requirements pertaining to C&I and Cybersecurity for Hydro/PSP Plants.
  • Knowledge of IEC 104, IEC 101, IEC 61850, Modbus, OPC, and similar control system network protocols.
  • Experience in IMS implementation for operational Plant. Including ISMS 27001.
  • Experience with CMMS (Computerized Maintenance Management Systems) for Plant maintenance works.
  • Proven experience with C&I system, including specification, design, assessment, verification, testing, installation, commissioning, and maintenance of Hydro/PSP Plant SCADA and Control system.
  • Knowledge of analytics tools for performance optimization and risk assessment.